Sultana build log – Part 61

Time for some work on the masts. For the mainmast I need…

An octagonal thing at the base.

3D design of mast base piece

And some cleats.

3D design of cleat

And the boom rest.

3D design of boom rest

The mast was shaped, stained, and painted red at the bottom. The parts from above were 3D printed in black and glued on. Here is the base of the mast dry-fitted.

3D printed elements on mainmast
3D printed elements on mainmast

I did similar work on the foremast but discovered that the cleats were positioned too low, so that will need a redo.

Leave a Reply

Your e-mail address will not be published. To prevent spam, URLs are forbidden in comments.